If an Alpha channel exists in the specified color, then that alpha channel will be used to overlay the row. If no Alpha channel is specified, then a default alpha level will be used, rather than overlaying the row with a solid color.
Imports Infragistics.Win.UltraWinSchedule Imports Infragistics.Win.UltraWinGanttView Private Sub setSelectionOverlay() ' Sets the color for the borders drawn around the selected row(task) in the grid portion of the control Me.ultraGanttView1.GridSettings.SelectionOverlayBorderColor = Color.Red ' Sets the thickness of the border drawn around the selection overlay in the grid portion of the control Me.ultraGanttView1.GridSettings.SelectionOverlayBorderThickness = 4 ' Sets the color to overlay the selected row(Task) in the grid portion of the control Me.ultraGanttView1.GridSettings.SelectionOverlayColor = Color.Green End Sub
using Infragistics.Win.UltraWinSchedule; using Infragistics.Win.UltraWinGanttView; private void setSelectionOverlay() { // Sets the color for the borders drawn around the selected row(task) in the grid portion of the control this.ultraGanttView1.GridSettings.SelectionOverlayBorderColor = Color.Red; // Sets the thickness of the border drawn around the selection overlay in the grid portion of the control this.ultraGanttView1.GridSettings.SelectionOverlayBorderThickness = 4; // Sets the color to overlay the selected row(Task) in the grid portion of the control this.ultraGanttView1.GridSettings.SelectionOverlayColor = Color.Green; }
Target Platforms: Windows 10, Windows 8.1, Windows 8, Windows 7, Windows Server 2012, Windows 7, Windows Vista SP1 or later, Windows XP SP3, Windows Server 2008 (Server Core not supported), Windows Server 2008 R2 (Server Core supported with SP1 or later), Windows Server 2003 SP2