Hi,
when a user selects any appointment and then press Alt Key and do drag drop on any other existing appointment in ultradayview/ultraweekview, i want the existing appointment to be replaced with the dragged appointment.
Basically i want a functionality where Alt+Drag drop will do an appointment replacement.
Thanks,
Chitra
Hello,
I am just checking about the progress of this issue. Let me know If you need any further assistance on this matter ?
Thank you for using Infragistics Components
The Key Modifier works for me, i am able to replace appointment on Alt+Drag drop.
There is one UI Issue i am facing, when i do Alt+drag drop, while dragging an appointment over existing appointment, the size of the appointments shrinks(Screen shot Alt+DragDrop.jpg). And as soon as i drop, the existing appointments get deleted and dragged appointment takes proper size.(Screen shot After_Alt+DragDrop.jpg)
Is there a way i can show them as overlapping existing appoinment with the dragged appoinment before replacing it.(i dont want to show that shrinking of appointments while performin alt+drag drop)
OR is it possible to show only Drag pointer while Alt+Drag Drop instead of moving appointment with mouse pointer while performing Drag-Drop.