Visualize work stoppage on Gantt chart
posted

Hi!

I would like to visualize a work stoppage on a specific element in a Gantt chart. What I mean by stoppage is to indicate that work in that period of time has stopped and will resume afterwards.   See the attached file to understand how I want to visualize a work stoppage.  For those reading this and unlikely to look at the image, I want to carve out a "hole" in a specific Gantt chart segment and color it different from the rest of the segment.  If that's possible, how do I do it? If that's not possible what other choices do I have available? I suppose I could break the segment up into multiple pieces (less desirable) with a stop segment in between the two work segments that were previously joined. I would rather "inline" the stoppage if possible as I find it better visualizes the situation.

Any suggestions appreciated!

Craig

Parents
  • 53790
    Suggested Answer
    posted

    Hello Craig,

    One possible approach to achieve desired behavior could be if you are using FillSceneGraphe event to Bo primitive to draw your breake (stoppage). I made small sample for you. Please take a look at the attached sample and video file for mroe details and let me know if you have any questions.

    Regards

     